STUDY OF THE HYDROELECTRIC POTENTIAL OF THE SMALL HYDROELECTIC STATION PLANNED FOR VANDAM CHAY, GABALA REGION
DOI:
https://doi.org/10.58225/sw.2024.2-122-127Keywords:
sprinkler, displacement, suppressed derivation pipe, losses, speed, design pressure, built-in power, power consumptionAbstract
The paper examined SHES 'assessment of hydropower potential. To this end, based on many years of river data, hydrology was investigated and water intakes corresponding to the corresponding percentage of provision were assigned. The capacity set in accordance with the design pressure, taking into account the costs and losses received by the HES insurer, is set in annual energy consumption.
- Views
- 111
- Downloads
- 149
References
1. Musaev Z.S., Memmedov K.M., Zerbeliev M.S. (2019). Hydraulics and hydraulic machines. Baku,NPM “Tehsil”, p. 420
2. Designer's Handbook. Hydraulic structures / G.V.Zheleznyakov, Yu.A.Ibadzade and others under general ed. V. P. Nedrigi, M. Stroyizdat. 1983, 543 pp
3. Kiselev P.G. (1972). Handbook of hydraulic calculations, M., Energy, p.312
4. Karelin V.Ya., Volshanik V.V. (2016). Structures and equipment of small hydroelectric power stations. M.: Energoatomizdat, p.200
5. Beglyarova Zh.S. (1999). Layout of structures for small diversion hydroelectric power stations. M.,State Unitary Enterprise, p. 15
Published
Issue
Section
License
Copyright (c) 2024 Valiyev Jalaladdin (Author)

This work is licensed under a Creative Commons Attribution 4.0 International License.