STUDY OF THE HYDROELECTRIC POTENTIAL OF THE SMALL HYDROELECTIC STATION PLANNED FOR VANDAM CHAY, GABALA REGION
Keywords:
sprinkler, displacement, suppressed derivation pipe, losses, speed, design pressure, built-in power, power consumptionAbstract
The paper examined SHES 'assessment of hydropower potential. To this end, based on many years of river data, hydrology was investigated and water intakes corresponding to the corresponding percentage of provision were assigned. The capacity set in accordance with the design pressure, taking into account the costs and losses received by the HES insurer, is set in annual energy consumption.
Downloads
Published
2025-02-04
Issue
Section
Articles